i love that the bit between barcelona and valencia is labelled as operational when it has significantly lower speeds than the HSR network, it does not use ECTS, it does not use 25kV AC, and it does not use standard gauge so it needs gauge convertible trains
I know high speed rail is imperfect here compared to parts of Asia and that development is slower than people would like, but to me this map is still awesome and exciting. I'm a little confused by the sarcasm (and the pessimism in the replies). Am I missing something?